HyDeploy runs for three years from April 2017 – March 2020. It has three phases. Click here to see a timeline.
Phase 1 (To June 2018)
Laboratory testing of gas blends; safety checks in homes and buildings in the proposed live trial area; and preparing the safety case for the Health & Safety Executive.
Phase 2 (July 2018 – March 2019)
Design, build and installation of the hydrogen production and blending units on the campus; any improvements to the campus pipe network.
Phase 3 (Apr 2019 – Mar 2020)
This is the proposed live trial phase.